Pre Cost Module

OrTexOrTex

Knit Fabric Production Administrative Program is a knitting Production Monitoring Program which works at Windows 2000/2003/2008 Operating System,  which uses Microsoft SQL 2000 /2005/2008 databases, works as online integrated with Outlook versions, multiuser, encrypted and based on Windows.

Knit Fabric Production Administrative Program Pre Cost Module

  • You can make cost studies on customer basis. 
  • You can enter multiple yarn mixes. 
  • You can enter the price of each yarn in the currency you want. 
  • For each yarn, you can enter the yarn dye costs in the desired foreign currency with the waste. 
  • You can enter the cost of knitting in the desired currency. 
  • You can create the desired number of painting operations on the parameter definitions screen. 
  • You can see the yarn, raw and dyed fabric costs in both TL and the desired bid currency by determining the bid currency. 
  • By determining the profit rate, you can enter the bid number in both TL and bid currency. 
  • You can enter shrinkage values ​​for the relevant cost study. 
  • You can enter gr / m2 and width values ​​for raw, dyed and washed form for the relevant cost study. 
  • You can enter test values ​​for this cost study with the test definitions defined on the parametric screens. 
  • You can get "Pre-Cost Report" showing all cost values ​​on a single page. 
  • You can send the cost study to your customer by e-mail. 
  • You can record the samples you send to your customers. You can report according to their status. 
  • For example "Pending", "Sent", "Approved" etc. You can get detailed reports such as "Sample General Report", which year, month, customer, which samples were sent. 
  • With the "Sample Analysis Report", you can receive statistical reports such as how many samples have been sent, how many of them have been approved and the rate of approval according to year, month and customers.